Monday, August 29, 2011

Final Framing

We finished the final framing this week.  It's exciting to "see" the house come together. 


This photo is a view of our master bathroom.  I'm standing in the bedroom taking a photo of the bathroom and directly behind that is the master closet. 


Doti gets into the action.


Martin and Jeff are working on the formal dining room.  It has a recessed roof.  We'll put in some unique lighting to make this a nice focal point.

I'm standing in the living room bay window, taking a photo into the house.  As you can see, our living room has two archways on both sides of the wall.  Through those, you can see the great room and kitchen area.

This month, we also worked on installing the electrical lines.  I took this photo from the neighbor's yard.  We had to cross under the next door neighbors driveway and connect the wires to a new SRP box (notice the orange and white striped construction signs in the far right side of the photo.)  That's where they installed the new box.  Since the driveway was torn out, the neighbor was not able to drive into her garage for 24 hours.  On top of that, she was without power one morning for about 4 hours.  Luckily, she didn't seem to mind too much and has been really great to work with!  With electrical lines in, we were able to get a temporary metering device, allowing us to have electric without the use of a noisy, old, generator!  Yay!